Preliminary Property Report — $49
PDF within 2 business days
- Parcel & GIS summary
- Zoning + setbacks
- Flood zone & FIRM panel
- Soils + hydrologic group
- Topography & modelled drainage outlet
A zoning and flood check verifies a parcel's zoning district and setbacks against county records, and its FEMA flood zone, FIRM panel, and effective date — the two questions that decide what can be built and what insurance will cost, answered from the record.
A zoning and flood check in Davidson County answers the two questions that decide a purchase: what the zoning — Lexington, Thomasville, Denton, or county — permits on the parcel, with setbacks; and what the FEMA record says, with flood zone, FIRM panel, and effective date, along the Yadkin River, Abbott's Creek, and the High Rock Lake shoreline, where mapped flood hazard and shoreline rules overlap. Panels that are dated get a re-verify marker, so you can see the age of the record you are relying on.
Serving Lexington, Thomasville, Denton, Welcome and the rest of Davidson County from our base in Candor.
No — it reports what the public record says, with sources. A binding determination comes from the county.
The report flags it with a re-verify marker and names the panel and effective date so you can see the age yourself.
Zone X means outside the mapped special flood hazard area. It is a mapping category, not a promise — the report says so.
Tell us the property and we will email the headlines — parcel, zoning, flood, and soils — after a human review.
All land evaluation topics · Davidson County service directory
Pick a tier, check out, and tell us the property address or parcel ID and county at checkout. Your report is built from public records — GIS parcel data, zoning, flood, soils, and modelled drainage — with the source on every number, and reviewed by JP before it reaches your inbox.
PDF within 2 business days
PDF within 3–5 business days
Dossier in 3–5 business days, call scheduled with delivery
Data evaluation from public records and modelled analysis. Not a survey, not a legal zoning determination, not an engineering design. Modelled drainage is MODELLED, NOT SURVEYED. Every report is human-reviewed before it is sent.