Preliminary Property Report — $49
PDF within 2 business days
- Parcel & GIS summary
- Zoning + setbacks
- Flood zone & FIRM panel
- Soils + hydrologic group
- Topography & modelled drainage outlet
A land evaluation pulls the public record on a parcel — GIS boundaries and acreage, zoning, flood, soils, and terrain — into one claims-backed summary where every number carries its source, so a buyer, seller, or owner can decide with the record in front of them instead of a guess.
Moore County is Sandhills country, and a land evaluation here has to read two landscapes at once: deep, sandy uplands under longleaf pine — the ground under Pinehurst's golf courses and Southern Pines horse country — and the creek bottoms along the Little River and Drowning Creek, where the soils and the flood record change completely within a few hundred yards. Buyers here are often deciding from out of state — relocating and Fort Bragg households, retirees, second-home buyers — so the evaluation puts the parcel record, not a drive-by impression, in front of them first.
Serving Pinehurst, Southern Pines, Aberdeen, Carthage, Whispering Pines, Vass and the rest of Moore County from our base in Candor.
No. It is a data evaluation from public records and modelled analysis — not a survey, not a legal determination. Boundaries that matter legally need a licensed surveyor.
A PDF report: parcel and GIS summary, zoning and setbacks, flood zone and FIRM panel, soils, topography and modelled drainage, with sources and a claims footer.
Preliminary reports are delivered within 2 business days; full dossiers within 3–5 business days, after human review.
Tell us the property and we will email the headlines — parcel, zoning, flood, and soils — after a human review.
All land evaluation topics · Moore County service directory
Pick a tier, check out, and tell us the property address or parcel ID and county at checkout. Your report is built from public records — GIS parcel data, zoning, flood, soils, and modelled drainage — with the source on every number, and reviewed by JP before it reaches your inbox.
PDF within 2 business days
PDF within 3–5 business days
Dossier in 3–5 business days, call scheduled with delivery
Data evaluation from public records and modelled analysis. Not a survey, not a legal zoning determination, not an engineering design. Modelled drainage is MODELLED, NOT SURVEYED. Every report is human-reviewed before it is sent.