Preliminary Property Report — $49
PDF within 2 business days
- Parcel & GIS summary
- Zoning + setbacks
- Flood zone & FIRM panel
- Soils + hydrologic group
- Topography & modelled drainage outlet
An industrial-neighbour check for a Hamlet property answers the owner's questions when big industrial land moves nearby: What is approved or announced, and how far is it from my parcel? What does it mean for water, noise, truck traffic, and my land's value — and for my options to sell, hold, or use my property as I planned? Richmond County is an impact market — Amazon's $10B campus in the county is the headline — and this check reads your parcel's position against the industrial record, from public sources, with dates.
Hamlet is a railroad town — the Seaboard hub, the depot, the yard — so industrial neighbours are not new here; the scale is. A campus-sized development in the county changes the questions for Hamlet owners from the usual zoning ones to corridor ones: which roads carry the construction and truck traffic, which parcels sit between the site and town, and what the county's approvals actually say versus what rumour says. The check assembles the public record for your parcel and its surroundings — GIS position and distance to approved or announced industrial land, zoning, flood and water context, and the dated sources behind each claim — and separates approved fact from announced intention from speculation, in writing.
Serving Rockingham, Hamlet, Ellerbe and the rest of Richmond County from our base in Candor.
Your parcel's record plus its industrial context: distance and direction to approved or announced industrial sites from public records, zoning, flood and drainage context, and a dated source list. It reports what is documented — it does not predict property values.
The check does not make that call — it gives you the documented position of your parcel (what is approved, what is only announced, what is rumour) so you or your advisor can. The $299 tier adds a call to walk the record through.
Yes — separating documented approvals from rumour is half the point. If the record has nothing, the report says so, with the sources searched and their dates.
Tell us the property and we will email the headlines — parcel, zoning, flood, and soils — after a human review.
Pick a tier, check out, and tell us the property address or parcel ID and county at checkout. Your report is built from public records — GIS parcel data, zoning, flood, soils, and modelled drainage — with the source on every number, and reviewed by JP before it reaches your inbox.
PDF within 2 business days
PDF within 3–5 business days
Dossier in 3–5 business days, call scheduled with delivery
Data evaluation from public records and modelled analysis. Not a survey, not a legal zoning determination, not an engineering design. Modelled drainage is MODELLED, NOT SURVEYED. Every report is human-reviewed before it is sent.