Preliminary Property Report — $49
PDF within 2 business days
- Parcel & GIS summary
- Zoning + setbacks
- Flood zone & FIRM panel
- Soils + hydrologic group
- Topography & modelled drainage outlet
The Property Dossier is the full report: parcels, zoning, flood, soils, terrain and modelled drainage, vegetation, section risk scores, underground-infrastructure evidence tiers, and a forecast timeline — every value registered as a claim with its source, badge, and method.
The dossier format was proven on real Montgomery County land — our own test property in Candor — precisely so its accuracy could be checked against the deed, the recorded plat, and the ground. The register behind that dossier holds 35 claims (facts, observations, calculations, and honestly-labelled unknowns). A dossier for your Montgomery County property is built the same way, and its footer shows the same register discipline.
Serving Candor, Troy, Biscoe, Star, Mount Gilead and the rest of Montgomery County from our base in Candor.
Provenance. Every number is a registered claim — source, date, method, and badge (FACT / OBSERVATION / CALCULATION / UNKNOWN) — and unknowns are printed as unknowns.
A surface-water screening model (v1.0) scoring sections of the property, with the scoring rule printed in the report so you can see how a score was reached.
Yes — the free preliminary summary shows the format, and an anonymized sample dossier is available on request.
Tell us the property and we will email the headlines — parcel, zoning, flood, and soils — after a human review.
All land evaluation topics · Montgomery County service directory
Pick a tier, check out, and tell us the property address or parcel ID and county at checkout. Your report is built from public records — GIS parcel data, zoning, flood, soils, and modelled drainage — with the source on every number, and reviewed by JP before it reaches your inbox.
PDF within 2 business days
PDF within 3–5 business days
Dossier in 3–5 business days, call scheduled with delivery
Data evaluation from public records and modelled analysis. Not a survey, not a legal zoning determination, not an engineering design. Modelled drainage is MODELLED, NOT SURVEYED. Every report is human-reviewed before it is sent.