Preliminary Property Report — $49
PDF within 2 business days
- Parcel & GIS summary
- Zoning + setbacks
- Flood zone & FIRM panel
- Soils + hydrologic group
- Topography & modelled drainage outlet
A drainage analysis models where water goes on a parcel — flow accumulation and the modelled outlet from LiDAR terrain data — and screens the sections of the property most at risk of standing water, before anyone digs or pours.
Randolph drainage is a slope story. Uwharrie foothill parcels shed water fast — the risk there is erosion and delivering a hillside's runoff onto the neighbour or the road below — while Deep River tributary bottoms collect it and pond. A drainage analysis models flow accumulation and the outlet from LiDAR terrain, so an Asheboro subdivision lot, a sloped Ramseur acre, and a river-bottom tract each get the answer their terrain actually gives. New subdivisions going up around the Toyota corridor make this a pre-purchase question, not an after-the-fact complaint. Modelled drainage is always labelled MODELLED, NOT SURVEYED.
Serving Asheboro, Randleman, Liberty, Ramseur, Archdale and the rest of Randolph County from our base in Candor.
Not from records alone — buried infrastructure is shown by evidence tier and stays Unknown without an NC 811 locate and field verification.
The analysis is the plan, not the fix. RHS also does the field work — and a Dossier + Call fee is credited toward a job booked within 60 days.
Public LiDAR terrain (DEM) data and parcel records, named with dates in the report's claims footer.
Tell us the property and we will email the headlines — parcel, zoning, flood, and soils — after a human review.
All land evaluation topics · Randolph County service directory
Pick a tier, check out, and tell us the property address or parcel ID and county at checkout. Your report is built from public records — GIS parcel data, zoning, flood, soils, and modelled drainage — with the source on every number, and reviewed by JP before it reaches your inbox.
PDF within 2 business days
PDF within 3–5 business days
Dossier in 3–5 business days, call scheduled with delivery
Data evaluation from public records and modelled analysis. Not a survey, not a legal zoning determination, not an engineering design. Modelled drainage is MODELLED, NOT SURVEYED. Every report is human-reviewed before it is sent.