Preliminary Property Report — $49
PDF within 2 business days
- Parcel & GIS summary
- Zoning + setbacks
- Flood zone & FIRM panel
- Soils + hydrologic group
- Topography & modelled drainage outlet
A land evaluation pulls the public record on a parcel — GIS boundaries and acreage, zoning, flood, soils, and terrain — into one claims-backed summary where every number carries its source, so a buyer, seller, or owner can decide with the record in front of them instead of a guess.
Randolph County runs from the Uwharrie foothills in the west to the Deep River valley and Asheboro's growth in the east — and since Toyota's battery plant opened in Liberty in November 2025, the county's north-east corridor is seeing land pressure its western townships are not. A land evaluation separates those realities parcel by parcel: GIS record, zoning, flood, soils, and terrain for a foothill tract near the Uwharries, a Deep River bottom, or a lot in the plant's commute shed around Liberty, Ramseur, and Randleman, each read on its own record.
Serving Asheboro, Randleman, Liberty, Ramseur, Archdale and the rest of Randolph County from our base in Candor.
No. It is a data evaluation from public records and modelled analysis — not a survey, not a legal determination. Boundaries that matter legally need a licensed surveyor.
A PDF report: parcel and GIS summary, zoning and setbacks, flood zone and FIRM panel, soils, topography and modelled drainage, with sources and a claims footer.
Preliminary reports are delivered within 2 business days; full dossiers within 3–5 business days, after human review.
Tell us the property and we will email the headlines — parcel, zoning, flood, and soils — after a human review.
All land evaluation topics · Randolph County service directory
Pick a tier, check out, and tell us the property address or parcel ID and county at checkout. Your report is built from public records — GIS parcel data, zoning, flood, soils, and modelled drainage — with the source on every number, and reviewed by JP before it reaches your inbox.
PDF within 2 business days
PDF within 3–5 business days
Dossier in 3–5 business days, call scheduled with delivery
Data evaluation from public records and modelled analysis. Not a survey, not a legal zoning determination, not an engineering design. Modelled drainage is MODELLED, NOT SURVEYED. Every report is human-reviewed before it is sent.